- Risk qualitative Analysis: Evaluates key characteristics of individual risks enabling them to be prioritized for further action. Select risk characteristics => Collect and analyze data => Prioritize Risks => Categorize risk causes => Document results.
- Qualitative risk ratings: An indication of the potential impact of risks on a project. Typically a measure of the following characteristic; probability , Impact. Typically expressed as Low, Medium, High.
- High Risk: 50% or higher ( Likely)
- Medium Risk : Between 10% and 50% ( Unlikely)
- Low Risk: 10% or lower ( Very unlikely)
- High probability can be expressed
- as a %
- As a values statement
- As a comparison
- As a frequency