  1. Risk qualitative Analysis: Evaluates key characteristics of individual risks enabling them to be prioritized for further action.  Select risk characteristics => Collect and analyze data => Prioritize Risks => Categorize risk causes => Document results.
  2. Qualitative risk ratings: An indication of the potential impact of risks on a project.  Typically a measure of the following characteristic; probability , Impact.  Typically expressed as Low, Medium, High.
    • High Risk: 50% or higher ( Likely)
    • Medium Risk : Between 10% and 50% ( Unlikely)
    • Low Risk: 10% or lower ( Very unlikely)
      • High probability can be expressed 
        • as a %
        • As a values statement
        • As a comparison
        • As a frequency